HVAC foam selection starts from the pipe, duct or equipment detail and its operating conditions. Compare XPE, IXPE and IXPP for the required thickness, thermal exposure, fixing method and complete insulation construction.

Condensation control needs the complete detail

Provide line or surface temperature, ambient temperature and humidity, installation position and the project design criteria. Low water absorption does not prove vapour-tight joints or a condensation-free system. Review seams, valves, flanges, hangers, penetrations and inspection openings, including how the vapour-control layer remains continuous.

Material ranges and test conditions

Factory data: density is a nominal-grade range; tolerances and ratio-specific performance are on the linked material pages. Capability ranges do not establish that every grade, thickness and facing combination is available.

Material ranges and test conditions
PropertyXPEIXPEIXPP
Expansion ratio3–40×3–40×5–25×
Nominal density (kg/m³)26.8–30026.8–30040–140 (7–25× published grades)
Single layer (mm)3–150.1–151–6
Heat-bonded multi-layer (mm)15–20015–2006–100
Width (mm)500–2000500–2000500–1500
Compression set: GB/T 6669, 23±2 °C, 22 hLimits ≤2%–≤11%, by ratioLimits ≤2%–≤11%, by ratioNot published in this data table
Water absorption: GB/T 1034, method 4≤0.2%–≤0.4%≤0.2%–≤0.4%Not published in this data table

For XPE and IXPE at 35x and 40x, the compression-set limit is ≤11%. Read each other ratio separately on its material page. No IXPP density or performance value is inferred for 5x.

Match the material to exposure

Choose a grade from the specified temperature, duration, load and contact conditions. IXPP literature gives a maximum up to 140 °C, not continuous-use approval for every wrapped pipe or laminate. Do not select a hot-surface application from that number alone. The core, facing and adhesive require a compatible operating range.

Facing and installation are part of the product

Plain sheet, adhesive-backed roll, foil-facing and cut panels have different installation needs. Define overlaps, tape, edge termination, substrate preparation and access for maintenance. A reflective facing needs an adjacent air space to contribute a radiant-barrier effect; foil alone does not establish the construction thermal resistance.

Keep thermal, acoustic and fire acceptance separate

Published sheet conductivity and absorption values apply to their stated methods and grades. They do not establish an installed duct thermal value, noise reduction, mould resistance or service life. Confirm whether the material is inside an airflow path or outside the duct, and specify the applicable fire and project acceptance requirements.

Agree the supplied and installed reference

Send the section drawing, grade, finished dimensions, facing, adhesive, quantity and intended inspection method. Confirm sample fit, joints and installation sequence. Retain the approved detail and review changes in materials, thickness or attachment. Appliance cabinet parts and round pipework have their own focused guides below.

Project FAQ

Does closed-cell foam guarantee no condensation?

No. Define the operating conditions, required thickness and continuous joints and vapour-control detail, then validate the complete installed construction.

Is IXPP density data available?

Yes. The published material table includes 7x, 10x, 15x, 20x and 25x grades. No density or performance values are inferred for the unpublished 5x grade.

Ordering and approval

Standard rolls and sheets: MOQ 1,000 m². Custom parts: minimum quantity confirmed from the drawing. Standard lead time is 15–20 days from order confirmation; confirm the selected specification and schedule. A4 material samples are free with shipping included; converted samples, dies and fixtures are quoted separately.

Agree the material identity, drawing revision, critical dimensions, measurement conditions and required evidence before production; retain the approval record for repeat orders and review changes.

Application and supply routes
Compare materials
Technical guides